Proje Bilgileri / Project Information

  • Proje Tarihi / Project Date: 2025
  • Yatırımcı / Investor: Ercan Plastik
  • Kapasite / Capacity: 4002 KWp
  • Panel Sayısı / Number of Panels: -
  • Kategori / Category:
  • Proje Yeri / Project Location: Nevşehir
Güneş Tarlası Nedir? Güneş Enerji Santrali (GES) olarak ta bilinen güneş tarlaları üzerine güneş paneli kurulumu yapılması neticesinde, güneş enerjisinden elektrik üretilmesi ve devlete enerji satılmasını ifade eder. Güneş Enerjisi Elektrik üretimi Büyük bir yatırım özelliği taşır.

How should Solar Farm Land Features and Land Selection be?

If you are planning to generate electricity based on Solar Energy on land, the characteristics of the land should be as follows.

  • Land (Field) should have a high insolation potential
  • Land (Field) should face south
  • The land (field) should be close to the electricity substation.

Is the distance of the solar field to the substation important?

Yes, it is very important. The distance of the land to the substation should be maximum 20 km. So how will you learn the distance between the substation and your land?

There is a simple way. You can learn the nearest substation by applying to the energy distribution company in your region with the island and parcel information of your land.

What is the Cost of a Solar Field?

There are many factors that determine the cost of a solar power plant

  • Land (Field) Cost
  • Cable pulling Cost according to the distance to the Substation
  • Excavation (Making the land suitable for solar panel installation)
  • Solar Panel Cost
  • Solar Panel Construction Cost
  • Installation

Considering the above costs, the approximate cost of a solar power plant on 1 Mw Land is around 1.218.000 USD.

How to Install a Solar Farm?

You have decided on the Solar Power Plant, so what are the procedures waiting for you? How is Solar Farm Installation done?

You start with the permission process from public institutions. You must first obtain permission for the energy investment you will make. The permission you will receive from public institutions is called a call letter.

The first thing you need to do is to go to the Provincial Directorate of Agriculture and apply with a petition. The purpose here is to determine whether your land is extremely fertile by calling agricultural engineers from the Ministry of Agriculture.